Please use this identifier to cite or link to this item: https://doi.org/10.48441/4427.2100
Fulltext available Open Access
DC FieldValueLanguage
dc.contributor.authorSchütte, Carsten-
dc.contributor.authorRane, Anant Shatrughan-
dc.contributor.authorTimmerberg, Sebastian-
dc.date.accessioned2024-12-05T13:52:33Z-
dc.date.available2024-12-05T13:52:33Z-
dc.date.issued2024-12-05-
dc.identifier.urihttps://hdl.handle.net/20.500.12738/16642-
dc.description.abstractThis poster of a case study deals with a real-world challenge in the Hamburg harbor area at the Aurubis site. The investigation aims to determine the feasibility of producing on-site green hydrogen for reducing a daily batch of copper-oxide in two scenarios. The target is to substitute natural gas as a reducing agent in the fire refining process of the anode furnace. This avoids the process-related greenhouse gas (GHG) emissions. A technical-economic analysis assesses the feasibility of utilizing an on-site electrolyzer with a wind turbine for the year 2023.en
dc.description.sponsorshipProjektträger Jülich (PtJ)en_US
dc.language.isoenen_US
dc.subjectwind hydrogenen_US
dc.subjectindustry transformationen_US
dc.subjectcopper reductionen_US
dc.subjectfeasibility studyen_US
dc.subjecthydrogen case studyen_US
dc.subject.ddc620: Ingenieurwissenschaftenen_US
dc.titleAssessing wind hydrogen production and resulting GHG emissions for Aurubis in Hamburgen
dc.title.alternativeBewertung der Wind-Wasserstoff-Produktion und der daraus resultierenden Treibhausgasemissionen für Aurubis in Hamburgde
dc.typePosteren_US
dc.relation.conferenceLarge Scale Systems Week 2024en_US
dc.identifier.doi10.48441/4427.2100-
dc.description.versionNonPeerRevieweden_US
openaire.rightsinfo:eu-repo/semantics/openAccessen_US
tuhh.identifier.urnurn:nbn:de:gbv:18302-reposit-199396-
tuhh.oai.showtrueen_US
tuhh.publication.instituteCompetence Center Erneuerbare Energien und Energieeffizienzen_US
tuhh.publication.instituteDepartment Umwelttechniken_US
tuhh.publication.instituteFakultät Life Sciencesen_US
tuhh.type.opusPoster-
tuhh.type.rdmtrue-
dc.relation.projectReallabor: NDRL - Norddeutsches Reallabor; Teilvorhaben: Projektmanagement, Gesamtsimulation, Datenintegration und -analyseen_US
dc.type.casraiConference Poster-
dc.type.diniOther-
dc.type.driverother-
dc.type.statusinfo:eu-repo/semantics/publishedVersionen_US
dcterms.DCMITypeImage-
tuhh.apc.statusfalseen_US
item.creatorGNDSchütte, Carsten-
item.creatorGNDRane, Anant Shatrughan-
item.creatorGNDTimmerberg, Sebastian-
item.fulltextWith Fulltext-
item.creatorOrcidSchütte, Carsten-
item.creatorOrcidRane, Anant Shatrughan-
item.creatorOrcidTimmerberg, Sebastian-
item.grantfulltextopen-
item.cerifentitytypePublications-
item.languageiso639-1en-
item.openairecristypehttp://purl.org/coar/resource_type/c_6670-
item.openairetypePoster-
crisitem.author.deptCompetence Center Erneuerbare Energien und Energieeffizienz-
crisitem.author.deptDepartment Umwelttechnik-
crisitem.author.orcid0000-0003-3000-6908-
crisitem.author.parentorgPräsidium-
crisitem.author.parentorgFakultät Life Sciences-
crisitem.project.funderBundesministerium für Wirtschaft und Klimaschutz-
Appears in Collections:Publications with full text
Files in This Item:
File Description SizeFormat
2024-12-03_H2_WEA_poster_ILES.pdf348.34 kBAdobe PDFView/Open
Show simple item record

Page view(s)

36
checked on Jan 2, 2025

Download(s)

10
checked on Jan 2, 2025

Google ScholarTM

Check

HAW Katalog

Check

Note about this record


Items in REPOSIT are protected by copyright, with all rights reserved, unless otherwise indicated.